Deliverables

What you get after every site visit.

A fixed flight plan, the same process every time, and a dated report in your shared folder after each visit. Every report is built around what your project needs.

The process

The same four steps on every visit, so every report compares to the last.

  1. 01

    Site visits

    Flights on a set interval: weekly, biweekly, monthly, or at milestones, scheduled around site activity.

  2. 02

    Fly the plan

    Boundary and flight settings are saved once and re-flown on every visit, so each capture covers the site the same way.

  3. 03

    Process

    Imagery is reconstructed into an orthomosaic, surface model, and 3D data, then checked and measured.

  4. 04

    Report

    A dated Site Intelligence Report and the project files go to your shared Drive folder, ready for a pay application or meeting packet.

Flight by flight

Drag through the flights.

Six of the site's flights, captured on the same plan from clearing to slab. Drag the bar or tap a date.

Orthomosaic of the site on 03/14/2026 Orthomosaic of the site on 04/12/2026 Orthomosaic of the site on 05/03/2026 Orthomosaic of the site on 05/23/2026 Orthomosaic of the site on 06/06/2026 Orthomosaic of the site on 07/03/2026 07/03/2026
What a report contains

One visit, one dated record.

  • OrthomosaicA measurable, map-accurate image of the whole site, compared against every earlier flight.
  • Elevation changeA heatmap of where the ground rose and fell since the last visit, with cut and fill quantities.
  • Progress photosA gallery of aerial stills of the work in place on the day of the flight.
  • Oblique aerialsAngled views of structures, slabs, and walls that a top-down map can't show.
  • Time-lapseEvery flight stitched into one continuous view of the site taking shape.
Orthomosaic of a car dealership site in Carolina Park on 07/03/2026, showing the building slab, graded pad, and staging areas, with north arrow and 50 m scale bar
Orthomosaic, 07/03/2026
Elevation change heatmap of the graded building pad, 03/14/2026 to 05/03/2026. Warm tones show fill, cool tones show cut, on a scale of minus 2 to plus 2 feet
Elevation change, 03/14 to 05/03/2026
Oblique aerial photo of the dealership slab and foundation walls with the surrounding pine buffer
Oblique aerial, slab and foundation walls
Time-lapse

Watch the site take shape.

Every flight follows the same plan, so the captures line up into one continuous time-lapse of the site.

What this shows a GC

One flight, three answers.

Where are we?

The orthomosaic shows current site conditions at a measurable scale.

How much moved?

The surface model is the baseline for cut/fill and stockpile volumes on the next flight.

Who needs to know?

The report packages it for OAC meetings and owner updates without anyone opening GIS software.

File formats

Files your team already knows how to open.

DeliverableFormatTypical use
OrthomosaicGeoTIFF · KMZMeasuring, overlaying CAD and site plans, GIS and web map review
Digital surface / terrain modelGeoTIFF (DSM / DTM)Grades, drainage review, volume calculations
Point cloudLAS / LAZExisting conditions and design checks in your CAD software
3D modelOBJ · GLBExisting conditions, design review, stakeholder presentations
ContoursDXF · SHPDesign comparison, existing conditions
Design-versus-built overlayPDF · KMZChecking layout, grades, and progress against the design
Site Intelligence ReportPDFOAC meetings, lender draws, owner updates
Where the money goes

The costs a dated site record helps you control.

  • Find the breached fence this week, not on the county's notice.

    In Charleston County, a stormwater deficiency must be corrected within 3 working days of a notice of violation, followed by a stop-work order and/or $1,000 per day for each deficiency. South Carolina law allows civil penalties up to $10,000 per day of violation. The state construction stormwater permit requires inspections every week, no more than 9 days apart.

    Charleston County Stormwater Program · SC Code § 48-1-330 · SC DES Construction General Permit
  • Catch a grade error before the next trade builds on top of it.

    A 2026 study measured rework at 0.38% of contract value before completion and 0.76% including post-completion work, reaching 7.34% on single projects. The same study found rework under-reported by 300%.

    Love et al., ASCE Journal of Construction Engineering and Management, 2026
  • Know where your dirt went before the trucking invoice arrives.

    Borrow excavation on a recent SCDOT contract was priced at $48.00 to $86.40 per cubic yard.

    SCDOT Contract 4074030, October 2025
  • Record every pipe and conduit while the trench is still open.

    Damage to buried utilities costs about $30 billion a year. Federal research found $4.62 saved for every $1 spent locating utilities before construction.

    Common Ground Alliance · FHWA / Purdue University, 2000
  • Give your lender a dated, site-wide record of work in place with every draw.

    Every report shows the whole site on a known date, so draw reviews start from the same picture.

  • Document your site before the storm and again after it.

    A flight before a named storm and one after it give you a dated comparison of site conditions.

Industry examples

What recurring site documentation has caught for other contractors.

Remington Homes · Colorado~$187,000

Unbudgeted dirt found across a 75-lot development.

HaskellNo rework

A conduit in the wrong location and depth was caught on a routine flight, before the plumbing sub laid an 8-inch pipe. No schedule impact.

Story Contracting · UK~5,000 m³

Missing stone found through daily progress flights, before it became a payment dispute.

Source: published contractor case studies, June 2026

Aerial view of the Carolina Park development site at dusk
Case study · Coming soon

Carolina Park car dealership development

A full recurring-documentation program on a car dealership development in Carolina Park, Mount Pleasant, from first flight through the finished site.

Area
9.45 acres per flight
Resolution
1.7 cm (0.7 in) per pixel
Latest flight
07/03/2026

Map your site the same way.

Send the address and what you need to know. You'll get a scope and a flight date back.

Discuss your project →